Skip to main content
Bharat Surveyभारत सर्वे
वॉर रूम में लाइव डैशबोर्ड
Services · Quality monitoring

Proof that a work, a unit or an installation exists as recorded

Bharat Survey supports departments and implementing agencies that appoint a TPQMA agency or third party inspector with structured physical verification in the field. Our teams and offline app record every site visit with GPS, timestamps, photos and a checklist built from your specification, so a report says not only what was found, but exactly where and when. Engineering quality testing stays with qualified engineers and accredited labs; we make the verification layer auditable.

  • Checklists built from your specification
  • Geo-tagged photos on every visit
  • Offline for remote sites
  • Deviation reports by site and contractor
Location evidence
Survey #BS-0412
  • In areaInside approx. boundary
  • Accuracy±12 m
  • Time09:42 · fresh fix
  • Mock GPSNot detected
  • Interview length11 min
Added to accepted count
TPQMA agency field verification
District household survey · Round 1Updated 12s ago · sample
3,000
Target homes
2,184
Visits
1,962
Enumerated
1,871
Verified
Daily verified recordsLast 12 days
Physical site verificationGeo-tagged photosChecklist-based inspectionMicro irrigationPMEGP unitsDeviation reportsContractor-wise summariesOffline Android app
What TPQMA means

A Third Party Quality Monitoring Agency checks, independently of the contractor and often of the executing department, that works and assets meet specification. Housing, roads, water supply, urban infrastructure and scheme-funded assets all use TPQMA or third party inspection arrangements, with scopes that range from material testing to simple existence checks.

Tenders usually ask for three things: qualified personnel for the technical parts, a verification method that cannot be faked, and reporting fast enough to stop payments on defective work. The second and third are where most arrangements break down. Photos without locations, visit reports written days later, and spreadsheets that cannot be tied back to a site are common.

Typical tender requirements

  • Qualified engineers for technical checks
  • Site visit frequency per stage
  • Geo-tagged photographic evidence
  • Stage-wise inspection reports
  • Non-conformity tracking to closure
  • Monthly summary to the nodal officer
Method

The same five-part workflow works for a road, a drip system or a small factory.

01

Site list and checklist

Sites or beneficiaries are loaded from your MIS with IDs and expected locations. The inspection checklist is built from the specification or scheme guidelines, question by question.

  • MIS IDs pre-loaded
  • Expected location per site
  • Stage-wise checklist
District household survey · Round 1Updated 12s ago · sample
3,000
Target homes
2,184
Visits
1,962
Enumerated
1,871
Verified
Daily verified recordsLast 12 days
02

Visit with location evidence

The inspector opens the site in the app. GPS and time are stored automatically, and a visit far from the expected location is flagged for review.

  • Distance from expected site
  • Mock location detection
  • Time on site
Location evidence
Survey #BS-0412
  • In areaInside approx. boundary
  • Accuracy±12 m
  • Time09:42 · fresh fix
  • Mock GPSNot detected
  • Interview length11 min
Added to accepted count
03

Checklist and photos

Each checklist item gets a yes, no or measured value, with required photos at set angles. Photos cannot be picked from the gallery.

  • Camera-only photos
  • Measured values
  • Remarks per item
Survey 5/6 · Photo
Photo of a public issue
Camera · no faces
5 MB → 210 KB · with location/time
SkipTake photo
04

Deviations to closure

Every no or out-of-range value becomes a deviation with severity. Re-inspection closes it with new evidence.

  • Severity levels
  • Re-inspection link
  • Ageing report
Outside area · 14.2 km away · in review
05

Reports for payment decisions

Site-wise, contractor-wise and district-wise summaries, exportable for the nodal officer and for release or withholding of instalments.

  • Contractor summaries
  • District roll-up
  • Export with evidence links
District household survey · Round 1Updated 12s ago · sample
3,000
Target homes
2,184
Visits
1,962
Enumerated
1,871
Verified
Daily verified recordsLast 12 days
Quality
Accepted1871
In review64
Outside area19
Weak signal8
Coverage · by block
Block A62%
Block B48%
Block C31%
Block D24%
Agriculture

Drip and sprinkler subsidies are paid per installation, which makes existence and specification checks central.

Installation verification

Per installation
Visit the farmer's plot, confirm the system exists, matches the approved design (area, lateral spacing, emitter type, filter, pump connection) and is working. Plot photos and GPS confirm it is the approved plot.
Survey 5/6 · Photo
Photo of a public issue
Camera · no faces
5 MB → 210 KB · with location/time
SkipTake photo

Farmer confirmation

Beneficiary check
Short interview with the farmer: was it installed, when, by which supplier, did they pay the farmer share, and have they received training and after-sales service.
Survey 3/6 · AmenitiesOffline
How is drinking water in your area?
  • Comes regularly
  • Comes sometimes
  • Rarely / never
  • Don't know
✓ Section saved on phone · autosave
BackNext
PMKSY

The Per Drop More Crop component of Pradhan Mantri Krishi Sinchayee Yojana funds micro irrigation and related water-management interventions through states. States arrange physical verification of installations under their own procedures, often by sampling a share of beneficiaries in each district.

How we structure a verification round

Beneficiaries are sampled from the state's list by district and supplier, so problems concentrated with one supplier show up. Visits follow the checklist above, and the report separates not found, found but not as designed, found but not working, and verified.

  • Sample by district and supplier
  • Four-way outcome classification
  • Supplier-wise deviation rates
  • Evidence file per beneficiary

Our stance

Enterprises

The Prime Minister's Employment Generation Programme, implemented through KVIC and state agencies, links subsidy to units that are set up and running. Physical verification answers that question.

Is the unit there?

Visit the registered address, confirm the unit exists and operates the activity for which the loan and margin money were sanctioned, with geo-tagged photos of premises and machinery.

Is it working?

Record working status, employees present, and whether production or sales are happening, through observation and a short interview with the promoter.

Does it match records?

Compare machinery, activity and location with the project report on file and flag mismatches for the implementing agency.
Division of work

Split of TPQMA responsibilities
ActivityBharat SurveyQualified engineer / accredited lab
Existence and location verification
Checklist-based visual inspection
Beneficiary or promoter interviews
Material testing (concrete, steel, pipes)
Structural or design certification
Evidence management and reporting

For tenders needing technical testing, we work alongside the engineering firm or lab you appoint.

Not the right fit if

  • Tenders that require us to certify structural quality
  • Laboratory material testing
  • Claims of empanelment with a specific department
  • Verifications done without site visits

A good fit if

  • Physical existence and specification checks at scale
  • Scheme asset and beneficiary verification
  • Geo-tagged evidence for payment decisions
  • Partnering with engineering TPQMA firms on field coverage
FAQ

Straight answers to the questions people ask most about this topic.

What is a TPQMA agency?

A Third Party Quality Monitoring Agency is appointed to check, independently of the contractor, that works or assets meet specification. Scope varies by tender from material testing and engineering inspection to physical existence and functionality verification.

How do you prove a site visit really happened?

The app records GPS location, accuracy and time automatically, measures distance from the site's expected location, detects mock location settings, and only accepts photos taken with the camera during the visit.

Can you verify a sample instead of every site?

Yes. Many schemes verify a sample by district or supplier. We design the sample so problems concentrated with one supplier or area are detectable, and report the sample basis with the results.

How are TPQMA services priced?

On quotation. Cost depends on the number of sites, their spread and remoteness, visits per site, checklist length and whether technical personnel are needed alongside our field teams.

शाम के समय कस्बे का हवाई दृश्य
India Nationwide, Hindi-first

Share the scope, site list size and geography. We will reply with a field plan and quotation.